Ltd. spent 3.5 billion yuan to build the Zhuhai Yuexin Semiconductor high-end RF and FCBGA package loading board production and manufacturing project (hereinafter referred to as "Yuexin project") will enter the production phase as scheduled, in which the B1 plant officially started loading, and entered the equipment installation stage. The equipment commissioning stage has been entered, and the equipment installation is being carried out in some workshops of A1 plant. According to the construction progress, the project is expected to be fully completed and reach production by the end of 2024, and the annual output value will reach 3.5 billion RMB by then.
In the B1 workshop of Yuexin project, 16 sets of six-axis circuit board CNC drilling machines are in operation, and the machines are roaring, workers are skillfully operating these advanced production equipment from Germany, and the production workshop is a busy scene.
Zhuhai Yuexin Semiconductor Co., Ltd. is a wholly-owned subsidiary of Zhuhai Yueya Semiconductor Co. Ltd. is the first company in China to produce IC package boards, and is the first company in the world to use the "copper pillar layer method" to realize the mass production of "coreless" package boards. The company is the world's first company to achieve mass production of "coreless" packaging boards using the copper pillar lamination method.
Ltd. and the expansion of Nantong Yueya Semiconductor Project, the project is another important investment in Zhuhai. "After the Yuexin project is put into production, Yueya Semiconductor will become a semiconductor packaging and loading board solution provider serving global customers with multiple processes, multiple product lines and multiple plants. After the project is fully completed and reaches production, the annual output value is expected to reach 3.5 billion RMB." Xie Fengxia, Deputy General Manager of Yueya Semiconductor, said that the project will help the company continue to maintain its advantages of being the world's No. 1 supplier in the wireless RF package board market, the industry's No. 1 supplier of embedded package boards, and the nation's No. 1 supplier of FCBGA package boards.
The production of Yuexin project as scheduled is the acceleration of the project after the "land acquisition is the start of construction" in 16 days, the first plant topping out in 50 days and the second plant topping out in 90 days, which is the implementation of "industry first" in Fushan Industrial Park and the acceleration of the construction of Fushan Industrial City. It is a vivid practice to promote the construction of Fushan Industrial City.
The industrial park is the main battlefield for the high-quality development of the real economy in Doumen District, and also the western battlefield for the implementation of the "industry first" of the municipal government. Doumen District is striving to build four major industrial parks, including Fushan Industrial Park, Xinqing Science and Technology Industrial Park, Doumen Eco-Agriculture Park and Doumen Smart Manufacturing Economic Development Zone, to expand and strengthen industrial clusters such as new generation information technology, new energy and materials, high-end equipment manufacturing and modern agriculture. In the first half of the year, Doumen District achieved an added value of 10.787 billion yuan for industries above the scale, up 6.0% year-on-year; the added value of high-tech manufacturing, advanced manufacturing and equipment manufacturing industries in the district grew by 13.1%, 19.8% and 15.8% respectively.
Source URL:http://zhuhaidaily.hizh.cn/html/2022-08/08/content_1210_6562058.htm